PR & Marketing:
Technical Area - Engineering


Emergency engineering - Trant - Engineering PR

Case Study:

Featured Article - Press Coverage - Water Magazine

Emergency engineering: going above and beyond - Trant Engineering recounts the rapid delivery and installation of UV units at a Water Supply Works in response to water quality issues

Southern Water detected water quality issues at one of their Water Supply Works in Hampshire on 10 November 2019, which threatened to impact the supply of water to 300,000 customers in the county. Within 24 hours, Southern Water’s Emergency Recovery Team had formulated a plan to install a temporary ultraviolet (UV) disinfection system on site and assured the DWI that it would be operational in early January 2020. With short delivery times for UV equipment, winter working conditions and Christmas holidays, this was going to be a tall order…

Read more in Water Magazine here.

 
Keeping the Power Dry - Engineering PR

Case Study:

Featured Article - Ground Engineering

Keeping the Power Dry - National Grid has introduced flood defence improvements at its Walham substation as part of a wide scheme to protect its core infrastructure

Global climate change has resulted in extreme weather conditions, and nowhere has this had more impact than in the field of flood prevention. National Grid’s 400kV substation at Walham, near Gloucester, links the power stations in South Wales with the demand of central and south west England. It supplies electricity to 500,000 homes and industries plus the Government Communications Headquarters in Cheltenham…

The full feature is available in Ground Engineering here.

Previous
Previous

Energy

Next
Next

Food & Beverage